Case study library

Browse common deployment scenarios. Need a specific constraint (power, cooling, security, transport, or site works)? Talk to an engineer.

AI GPU Cluster Pod (10–20MW-ready)

AI & HPC

Edge POP for Telco Backhaul

Edge & Telco

Hardened Secure Comms Node

Defence & Secure

Enterprise Private Cloud Expansion

Enterprise / Private Cloud

Rapid Deployment DR Site

Disaster Recovery

Remote Industrial Operations Hub

Edge / Industrial

AI & HPC

Modular Data System for an AI training cluster—fast capacity without a new build

A modular, scalable configuration designed for high-density GPU compute with predictable delivery milestones.

Client

Confidential AI Infrastructure Team

Industry

Enterprise / Research

Services

Configuration, power & cooling design, delivery planning, commissioning support

Year

2026

Challenge

The team needed additional compute capacity quickly, with clear performance and efficiency targets, while minimizing site disruption. Key constraints included high rack density, redundant power paths, and a commissioning plan aligned to an aggressive go-live window.

Technician in a server room performing validation checks
Electrical infrastructure representing power integration and redundancy

Solution

We configured a Modular Data System as a repeatable GPU pod: modular IT space, scalable cooling approach, and an engineering-led spec pack suitable for procurement. Delivery was staged to align with site readiness, with test/commissioning steps defined up front for faster acceptance.

Results

12–16

weeks to deploy (typical fast-track path)

N+1

power & cooling resilience options

≤1.25

target PUE range (configuration-dependent)

What buyers and consultants value

Engineering-led documentation, predictable delivery, and configurations that map cleanly to procurement and site constraints.

★★★★★

“The spec pack was procurement-ready—clear options, drawings, and the right level of compliance detail for our review.”

Engineer operating an industrial control panel representing technical oversight

Engineering Consultant

Data Centre Design & Delivery

★★★★★

“We needed capacity fast. The staged delivery plan and commissioning steps reduced risk and kept stakeholders aligned.”

Modern industrial facility exterior representing delivery and deployment

Programme Lead

Enterprise Infrastructure

★★★★★

“Security and hardening requirements were handled as first-class configuration inputs, not an afterthought.”

Digital fingerprint icon representing secure infrastructure

Operations Manager

Secure Communications

Next step

Get a configuration and spec pack for your use-case

Tell us your IT load, timeline, site constraints, and security requirements. We’ll respond with a recommended Modular Data System configuration, options, and a clear path to quote and delivery.